OSHA 29 CFR 1910.147 requires documented energy control before servicing equipment where unexpected startup could injure a worker. On residential and light-commercial jobs this most often means an electrical disconnect, a gas valve, or stored pressure in a refrigerant circuit.
Idaho jobs get the national baseline packet. Every field a building department needs is covered; state-specific attachments are being added market by market.
One page: what a Idaho building department checks on this document, and the attachments that most often hold up issuance.
No account required. One email, unsubscribe any time.
General guidance for Idaho contractors, not legal advice. Confirm requirements with the authority having jurisdiction before filing.