A roofer and a plumber don't file the same paperwork. Pick your trade for the exact documents, the rejection that costs you the most days, and the inspection order.
tear-off, re-cover and full roof replacement, including underlayment, secondary water barrier and flashing
condenser, air handler and full system changeouts, plus duct alterations and line-set replacement
repipes, water heater replacement, fixture sets, drain and sewer work
panel changes, service upgrades, rewires, circuit additions and generator interlocks
insert and full-frame window replacement plus exterior door and slider units
vinyl, fiber cement, steel and LP re-side, including housewrap and trim
seamless gutter, downspout, leader and surface-drainage work
kitchen and bath remodels, structural alterations and interior build-outs
new construction, conditioned additions and whole-house projects with trade subs
full and partial structure demolition, including interior soft-strip