Demolition permits hinge on two things outside the demo itself: proof that utilities are disconnected and proof that the structure was surveyed for asbestos. Both belong on the application, not in a follow-up email.
District of Columbia jobs get the national baseline packet. Every field a building department needs is covered; state-specific attachments are being added market by market.
One page: what a District of Columbia building department checks on this document, and the attachments that most often hold up issuance.
No account required. One email, unsubscribe any time.
General guidance for District of Columbia contractors, not legal advice. Confirm requirements with the authority having jurisdiction before filing.