Illinois epa lead-safe rrp compliance record

Any window, siding, roofing or remodeling work that disturbs paint in a home built before 1978 falls under the EPA Renovation, Repair and Painting rule. The firm must be certified, a certified renovator must be assigned, and the Renovate Right pamphlet must be delivered and acknowledged before work starts.

What goes on the Illinois version

  • Year built and pre-1978 determination
  • EPA or state-authorized firm certification number
  • Certified renovator assignment and training date
  • Renovate Right pamphlet delivery acknowledgement
  • Containment, work practice and cleaning verification record

Illinois is one of our code-tuned states, so the packet builder also flags the state-specific attachments this scope triggers before you file.

Mistakes that get it kicked back

  • Starting work before the homeowner signs the pamphlet acknowledgement
  • Assuming vinyl siding over old wood siding is exempt when paint will be disturbed
  • Failing to keep the record for three years, which is what EPA asks for on inspection

Illinois metros

Get the Illinois filing checklist

One page: what a Illinois building department checks on this document, and the attachments that most often hold up issuance.

No account required. One email, unsubscribe any time.

General guidance for Illinois contractors, not legal advice. Confirm requirements with the authority having jurisdiction before filing.