Oregon epa lead-safe rrp compliance record

Any window, siding, roofing or remodeling work that disturbs paint in a home built before 1978 falls under the EPA Renovation, Repair and Painting rule. The firm must be certified, a certified renovator must be assigned, and the Renovate Right pamphlet must be delivered and acknowledged before work starts.

What goes on the Oregon version

  • Year built and pre-1978 determination
  • EPA or state-authorized firm certification number
  • Certified renovator assignment and training date
  • Renovate Right pamphlet delivery acknowledgement
  • Containment, work practice and cleaning verification record

Oregon jobs get the national baseline packet. Every field a building department needs is covered; state-specific attachments are being added market by market.

Mistakes that get it kicked back

  • Starting work before the homeowner signs the pamphlet acknowledgement
  • Assuming vinyl siding over old wood siding is exempt when paint will be disturbed
  • Failing to keep the record for three years, which is what EPA asks for on inspection

Oregon metros

Get the Oregon filing checklist

One page: what a Oregon building department checks on this document, and the attachments that most often hold up issuance.

No account required. One email, unsubscribe any time.

General guidance for Oregon contractors, not legal advice. Confirm requirements with the authority having jurisdiction before filing.