Indiana gutter, downspout & drainage scope record

Gutter work rarely needs a standalone building permit, but discharge location, storm tie-ins and HOA review do get questioned — and a written scope record protects the job when grading or basement moisture becomes a dispute.

What goes on the Indiana version

  • Gutter profile, size and linear footage
  • Downspout count, size and discharge points
  • Storm-sewer tie-in or daylight discharge notes
  • Gutter guard scope and homeowner sign-off block

Indiana is one of our code-tuned states, so the packet builder also flags the state-specific attachments this scope triggers before you file.

Mistakes that get it kicked back

  • Discharging downspouts against the foundation instead of the required distance from the wall
  • Tying into a municipal storm sewer without checking whether a plumbing permit is required
  • Leaving the discharge point undocumented when drainage complaints come back later

Indiana metros

Get the Indiana filing checklist

One page: what a Indiana building department checks on this document, and the attachments that most often hold up issuance.

No account required. One email, unsubscribe any time.

General guidance for Indiana contractors, not legal advice. Confirm requirements with the authority having jurisdiction before filing.