Demolition permits in Aurora, CO

A Aurora demolition permit covers full and partial structure demolition, including interior soft-strip. Save your license, insurance and bond details once, then produce the completed application — plus the attachments this jurisdiction expects — in under a minute.

Who pulls the demolition permit in Aurora

The contractor of record pulls the permit. Where Colorado allows it, an owner-builder can pull it directly by signing the owner-builder affidavit — the app swaps the contractor block for that disclosure automatically.

Where Aurora demolition permits are reviewed

Files with

City of Aurora Building Division

Department page

Online portal: Aurora4Biz

City contractor licensing is required before permits are issued.

Aurora spans Arapahoe, Adams and Douglas counties but permits centrally.

Why Aurora demolition applications get kicked back

The most common cause is utility disconnect confirmations and the asbestos survey not attached at application. Because the application is generated from your saved shop profile and the job scope, that field is populated before it ever reaches the counter.

What a Aurora demolition permit costs

A planning range for this trade — adjust the contract value to match the job.

Use the full contract amount — labor and materials. Under-declaring is the fastest way to a stop-work order.

Estimated Aurora permit cost

$176$2,919

Modelled range, not a quote from the Aurora building department.

  • Building permit feeCalculated from a declared job value of $12,000.$176 – $419
  • Bond / depositRefundable site-restoration deposits are common and are not a fee you lose.$0 – $2,500

Method: valuation-based lines follow the stepped ICC/UBC Table 1-A progression that most residential schedules are still derived from, widened to reflect how much neighboring jurisdictions differ. Confirm the exact figure with the office listed on this page before you put it in a bid.

Full Aurora permit cost breakdown →

Inspection sequence

  1. Pre-demolition utility verification
  2. Final site / grade

Never cover work ahead of the inspection that covers it — a re-open is the most expensive avoidable cost on a demolition job.

What each Aurora inspector checks, step by step →

Get the Aurora demolition permit checklist

One page covering the forms, attachments and inspection sequence Aurora demolition crews get held up on.

No account required. One email, unsubscribe any time.

Other trades in Aurora

Demolition permits in other Colorado metros

General guidance for Aurora demolition contractors, not legal advice. Confirm requirements and fees with the authority having jurisdiction.