Remodeling permits in Ann Arbor, MI

A Ann Arbor alteration permit covers kitchen and bath remodels, structural alterations and interior build-outs. Save your license, insurance and bond details once, then produce the completed application — plus the attachments this jurisdiction expects — in under a minute.

Who pulls the alteration permit in Ann Arbor

The contractor of record pulls the permit. Where Michigan allows it, an owner-builder can pull it directly by signing the owner-builder affidavit — the app swaps the contractor block for that disclosure automatically.

Where Ann Arbor remodeling permits are reviewed

Files with

Ann Arbor Building/Rental and Inspection Services

Department page

Online portal: STREAM

STREAM replaced eTrakit and is now the mandatory portal for all permit applications and plan submittals.

Why Ann Arbor remodeling applications get kicked back

The most common cause is a scope description too vague for the plans examiner to tell whether structure is being touched. Because the application is generated from your saved shop profile and the job scope, that field is populated before it ever reaches the counter.

What a Ann Arbor remodeling permit costs

A planning range for this trade — adjust the contract value to match the job.

Use the full contract amount — labor and materials. Under-declaring is the fastest way to a stop-work order.

Estimated Ann Arbor permit cost

$914$2,357

Modelled range, not a quote from the Ann Arbor building department.

  • Building permit feeCalculated from a declared job value of $45,000.$497 – $1,184
  • Plan reviewCommonly billed at roughly half to two-thirds of the permit fee.$267 – $573
  • Trade permits (separate)Mechanical, plumbing and electrical are usually pulled and billed separately.$150 – $600

Method: valuation-based lines follow the stepped ICC/UBC Table 1-A progression that most residential schedules are still derived from, widened to reflect how much neighboring jurisdictions differ. Confirm the exact figure with the office listed on this page before you put it in a bid.

Full Ann Arbor permit cost breakdown →

Inspection sequence

  1. Framing
  2. Rough trades
  3. Insulation
  4. Final building

Never cover work ahead of the inspection that covers it — a re-open is the most expensive avoidable cost on a remodeling job.

What each Ann Arbor inspector checks, step by step →

Get the Ann Arbor remodeling permit checklist

One page covering the forms, attachments and inspection sequence Ann Arbor remodeling crews get held up on.

No account required. One email, unsubscribe any time.

Other trades in Ann Arbor

Remodeling permits in other Michigan metros

General guidance for Ann Arbor remodeling contractors, not legal advice. Confirm requirements and fees with the authority having jurisdiction.