General contracting permits in Richmond, VA

A Richmond building permit covers new construction, conditioned additions and whole-house projects with trade subs. Save your license, insurance and bond details once, then produce the completed application — plus the attachments this jurisdiction expects — in under a minute.

Who pulls the building permit in Richmond

The contractor of record pulls the permit. Where Virginia allows it, an owner-builder can pull it directly by signing the owner-builder affidavit — the app swaps the contractor block for that disclosure automatically.

Where Richmond general contracting permits are reviewed

Files with

Richmond Permits and Inspections Office

Department page

Online portal: Online Permit Portal

An independent city outside any county; the walk-in permit center is open weekday mornings only.

Why Richmond general contracting applications get kicked back

The most common cause is the subcontractor list submitted without current license numbers for each trade. Because the application is generated from your saved shop profile and the job scope, that field is populated before it ever reaches the counter.

What a Richmond general contracting permit costs

A planning range for this trade — adjust the contract value to match the job.

Use the full contract amount — labor and materials. Under-declaring is the fastest way to a stop-work order.

Estimated Richmond permit cost

$2,329$25,357

Modelled range, not a quote from the Richmond building department.

  • Building permit feeCalculated from a declared job value of $250,000.$1,514 – $3,610
  • Plan reviewCommonly billed at roughly half to two-thirds of the permit fee.$815 – $1,747
  • Impact / capacity feesNew conditioned square footage can trigger school, road, water and sewer impact fees that dwarf the permit itself.$0 – $20,000

Method: valuation-based lines follow the stepped ICC/UBC Table 1-A progression that most residential schedules are still derived from, widened to reflect how much neighboring jurisdictions differ. Confirm the exact figure with the office listed on this page before you put it in a bid.

Full Richmond permit cost breakdown →

Inspection sequence

  1. Footing / foundation
  2. Framing
  3. Rough trades
  4. Insulation
  5. Final building

Never cover work ahead of the inspection that covers it — a re-open is the most expensive avoidable cost on a general contracting job.

What each Richmond inspector checks, step by step →

Get the Richmond general contracting permit checklist

One page covering the forms, attachments and inspection sequence Richmond general contracting crews get held up on.

No account required. One email, unsubscribe any time.

Other trades in Richmond

General contracting permits in other Virginia metros

General guidance for Richmond general contracting contractors, not legal advice. Confirm requirements and fees with the authority having jurisdiction.