Demolition permits in Memphis, TN

A Memphis demolition permit covers full and partial structure demolition, including interior soft-strip. Save your license, insurance and bond details once, then produce the completed application — plus the attachments this jurisdiction expects — in under a minute.

Who pulls the demolition permit in Memphis

The contractor of record pulls the permit. Where Tennessee allows it, an owner-builder can pull it directly by signing the owner-builder affidavit — the app swaps the contractor block for that disclosure automatically.

Where Memphis demolition permits are reviewed

Files with

Memphis and Shelby County Construction Code Enforcement (Develop901)

Department page

Online portal: Develop901 Portal

The joint city-county office also serves Arlington, Germantown, Lakeland and Millington, but Bartlett and Collierville permit separately.

Why Memphis demolition applications get kicked back

The most common cause is utility disconnect confirmations and the asbestos survey not attached at application. Because the application is generated from your saved shop profile and the job scope, that field is populated before it ever reaches the counter.

What a Memphis demolition permit costs

A planning range for this trade — adjust the contract value to match the job.

Use the full contract amount — labor and materials. Under-declaring is the fastest way to a stop-work order.

Estimated Memphis permit cost

$176$2,919

Modelled range, not a quote from the Memphis building department.

  • Building permit feeCalculated from a declared job value of $12,000.$176 – $419
  • Bond / depositRefundable site-restoration deposits are common and are not a fee you lose.$0 – $2,500

Method: valuation-based lines follow the stepped ICC/UBC Table 1-A progression that most residential schedules are still derived from, widened to reflect how much neighboring jurisdictions differ. Confirm the exact figure with the office listed on this page before you put it in a bid.

Full Memphis permit cost breakdown →

Inspection sequence

  1. Pre-demolition utility verification
  2. Final site / grade

Never cover work ahead of the inspection that covers it — a re-open is the most expensive avoidable cost on a demolition job.

What each Memphis inspector checks, step by step →

Get the Memphis demolition permit checklist

One page covering the forms, attachments and inspection sequence Memphis demolition crews get held up on.

No account required. One email, unsubscribe any time.

Other trades in Memphis

Demolition permits in other Tennessee metros

General guidance for Memphis demolition contractors, not legal advice. Confirm requirements and fees with the authority having jurisdiction.