General contracting permits in Memphis, TN

A Memphis building permit covers new construction, conditioned additions and whole-house projects with trade subs. Save your license, insurance and bond details once, then produce the completed application — plus the attachments this jurisdiction expects — in under a minute.

Who pulls the building permit in Memphis

The contractor of record pulls the permit. Where Tennessee allows it, an owner-builder can pull it directly by signing the owner-builder affidavit — the app swaps the contractor block for that disclosure automatically.

Where Memphis general contracting permits are reviewed

Files with

Memphis and Shelby County Construction Code Enforcement (Develop901)

Department page

Online portal: Develop901 Portal

The joint city-county office also serves Arlington, Germantown, Lakeland and Millington, but Bartlett and Collierville permit separately.

Why Memphis general contracting applications get kicked back

The most common cause is the subcontractor list submitted without current license numbers for each trade. Because the application is generated from your saved shop profile and the job scope, that field is populated before it ever reaches the counter.

What a Memphis general contracting permit costs

A planning range for this trade — adjust the contract value to match the job.

Use the full contract amount — labor and materials. Under-declaring is the fastest way to a stop-work order.

Estimated Memphis permit cost

$2,329$25,357

Modelled range, not a quote from the Memphis building department.

  • Building permit feeCalculated from a declared job value of $250,000.$1,514 – $3,610
  • Plan reviewCommonly billed at roughly half to two-thirds of the permit fee.$815 – $1,747
  • Impact / capacity feesNew conditioned square footage can trigger school, road, water and sewer impact fees that dwarf the permit itself.$0 – $20,000

Method: valuation-based lines follow the stepped ICC/UBC Table 1-A progression that most residential schedules are still derived from, widened to reflect how much neighboring jurisdictions differ. Confirm the exact figure with the office listed on this page before you put it in a bid.

Full Memphis permit cost breakdown →

Inspection sequence

  1. Footing / foundation
  2. Framing
  3. Rough trades
  4. Insulation
  5. Final building

Never cover work ahead of the inspection that covers it — a re-open is the most expensive avoidable cost on a general contracting job.

What each Memphis inspector checks, step by step →

Get the Memphis general contracting permit checklist

One page covering the forms, attachments and inspection sequence Memphis general contracting crews get held up on.

No account required. One email, unsubscribe any time.

Other trades in Memphis

General contracting permits in other Tennessee metros

General guidance for Memphis general contracting contractors, not legal advice. Confirm requirements and fees with the authority having jurisdiction.