Demolition permits in Madison, WI

A Madison demolition permit covers full and partial structure demolition, including interior soft-strip. Save your license, insurance and bond details once, then produce the completed application — plus the attachments this jurisdiction expects — in under a minute.

Who pulls the demolition permit in Madison

The contractor of record pulls the permit. Where Wisconsin allows it, an owner-builder can pull it directly by signing the owner-builder affidavit — the app swaps the contractor block for that disclosure automatically.

Where Madison demolition permits are reviewed

Files with

Madison Building Inspection Division

Department page

Online portal: Development Services Center

Plan review and permitting run through the city's Development Services Center under the state Uniform Dwelling Code.

The Dane County demolition packet

Generated by the same engine the app uses — these are the forms this scope actually triggers here, not a generic list.

Demolition in Dane County

4 documents on a $12,000 job.

  • Wisconsin requires a Dwelling Contractor Qualifier credential and a Dwelling Contractor certification to obtain a one- and two-family permit — the credential numbers belong on the application.

Why Madison demolition applications get kicked back

The most common cause is utility disconnect confirmations and the asbestos survey not attached at application. Because the application is generated from your saved shop profile and the job scope, that field is populated before it ever reaches the counter.

What a Madison demolition permit costs

A planning range for this trade — adjust the contract value to match the job.

Use the full contract amount — labor and materials. Under-declaring is the fastest way to a stop-work order.

Estimated Madison permit cost

$176$2,919

Modelled range, not a quote from the Madison building department.

  • Building permit feeCalculated from a declared job value of $12,000.$176 – $419
  • Bond / depositRefundable site-restoration deposits are common and are not a fee you lose.$0 – $2,500

Method: valuation-based lines follow the stepped ICC/UBC Table 1-A progression that most residential schedules are still derived from, widened to reflect how much neighboring jurisdictions differ. Confirm the exact figure with the office listed on this page before you put it in a bid.

Full Madison permit cost breakdown →

Inspection sequence

  1. Pre-demolition utility verification
  2. Final site / grade

Never cover work ahead of the inspection that covers it — a re-open is the most expensive avoidable cost on a demolition job.

What each Madison inspector checks, step by step →

Get the Madison demolition permit checklist

One page covering the forms, attachments and inspection sequence Madison demolition crews get held up on.

No account required. One email, unsubscribe any time.

Other trades in Madison

Demolition permits in other Wisconsin metros

General guidance for Madison demolition contractors, not legal advice. Confirm requirements and fees with the authority having jurisdiction.