General contracting permits in Austin, TX

A Austin building permit covers new construction, conditioned additions and whole-house projects with trade subs. Save your license, insurance and bond details once, then produce the completed application — plus the attachments this jurisdiction expects — in under a minute.

Who pulls the building permit in Austin

The contractor of record pulls the permit. Where Texas allows it, an owner-builder can pull it directly by signing the owner-builder affidavit — the app swaps the contractor block for that disclosure automatically.

Where Austin general contracting permits are reviewed

Files with

Austin Development Services Department

Department page

Online portal: Austin Build + Connect

Austin extends into Williamson County, and projects over the Edwards Aquifer trigger additional water-quality review.

Where Travis County permits are filed

Travis County Transportation and Natural Resources, Development Services

Online portal: MyPermitNow

Permits in unincorporated Travis County are applied for at MyPermitNow.org with plans uploaded as PDFs.

Jurisdiction detail confirmed from the county's own website. Cities inside Travis County may run their own building department.

The Travis County general contracting packet

Generated by the same engine the app uses — these are the forms this scope actually triggers here, not a generic list.

New construction / addition in Travis County

6 documents on a $12,000 job.

  • Texas requires an IECC energy compliance certificate at final inspection. Attach the REScheck or performance report to this packet.
  • Unincorporated Texas counties often issue no building permit — confirm whether the address falls inside a city ETJ before filing.

Interior remodel / alteration in Travis County

3 documents on a $12,000 job.

  • Texas requires an IECC energy compliance certificate at final inspection. Attach the REScheck or performance report to this packet.
  • Unincorporated Texas counties often issue no building permit — confirm whether the address falls inside a city ETJ before filing.

Why Austin general contracting applications get kicked back

The most common cause is the subcontractor list submitted without current license numbers for each trade. Because the application is generated from your saved shop profile and the job scope, that field is populated before it ever reaches the counter.

What a Austin general contracting permit costs

A planning range for this trade — adjust the contract value to match the job.

Use the full contract amount — labor and materials. Under-declaring is the fastest way to a stop-work order.

Estimated Austin permit cost

$2,329$25,357

Modelled range, not a quote from the Austin building department.

  • Building permit feeCalculated from a declared job value of $250,000.$1,514 – $3,610
  • Plan reviewCommonly billed at roughly half to two-thirds of the permit fee.$815 – $1,747
  • Impact / capacity feesNew conditioned square footage can trigger school, road, water and sewer impact fees that dwarf the permit itself.$0 – $20,000

Method: valuation-based lines follow the stepped ICC/UBC Table 1-A progression that most residential schedules are still derived from, widened to reflect how much neighboring jurisdictions differ. Confirm the exact figure with the office listed on this page before you put it in a bid.

Full Austin permit cost breakdown →

Inspection sequence

  1. Footing / foundation
  2. Framing
  3. Rough trades
  4. Insulation
  5. Final building

Never cover work ahead of the inspection that covers it — a re-open is the most expensive avoidable cost on a general contracting job.

What each Austin inspector checks, step by step →

Get the Austin general contracting permit checklist

One page covering the forms, attachments and inspection sequence Austin general contracting crews get held up on.

No account required. One email, unsubscribe any time.

Other trades in Austin

General contracting permits in other Texas metros

General guidance for Austin general contracting contractors, not legal advice. Confirm requirements and fees with the authority having jurisdiction.