Miami, FL permit applications

Working in Miami? Save your contractor license, insurance and bond details once, then produce a complete application for the next Miami job — building, mechanical, re-roof or plumbing — in under a minute, plus the OSHA paperwork your crew needs on site.

Miami permits by trade

Who pulls it, what the packet contains, and the inspection sequence — per trade.

What a Miami permit costs

Estimate the fee by trade and job value before you sign the work, and see the lines crews forget to quote.

Miami permit cost estimator

Miami inspection sequence

The order of calls by trade, what each inspector checks, and the failure that sends crews back most often.

Miami inspection guide

Documents Miami contractors generate most

Where Miami-Dade County permits are filed

Miami-Dade County Department of Regulatory and Economic Resources (RER)

Online portal: EPS Portal

Miami-Dade sits in the High-Velocity Hurricane Zone. Products used in construction must carry a Notice of Acceptance (NOA) verified through the county's Product Control search.

Jurisdiction detail confirmed from the county's own website. Cities inside Miami-Dade County may run their own building department.

Who reviews the permit near Miami

Incorporated cities and towns here run their own building departments — a county permit does not cover work inside their limits.

Files with

City of Miami Building Department

Department page

Online portal: iBuild

City of Miami sits within the Miami-Dade High-Velocity Hurricane Zone, requiring HVHZ-rated products and additional structural review.

Files with

City of Miami Beach Building Department

Department page

Historic district overlays such as Art Deco and MiMo require Design Review Board approval in addition to standard HVHZ building permits.

Files with

City of Hialeah Building Department

Department page

No online submittal — this office takes applications by email or at the counter.

Inside Miami-Dade's HVHZ, so residential roofing and window/door permits must use NOA-approved impact-rated products.

Files with

City of Coral Gables Building & Zoning Department

Department page

Online portal: Coral Gables ePermitting Portal

The Mediterranean Revival theme is code-mandated citywide, so most exterior alterations need Board of Architects approval on top of HVHZ review.

What a Miami-Dade County packet actually contains

Built by the same engine the app uses — these are the forms and attachments the scope triggers in this jurisdiction, not a generic list.

Re-roof / roof replacement in Miami-Dade County

7 documents on a $12,000 job.

  • Miami-Dade County enforces HVHZ product approval. Attach NOA numbers for every component before submitting.

HVAC changeout in Miami-Dade County

4 documents on a $12,000 job.

  • Miami-Dade County enforces HVHZ product approval. Attach NOA numbers for every component before submitting.

Window / door replacement in Miami-Dade County

4 documents on a $12,000 job.

  • Miami-Dade County enforces HVHZ product approval. Attach NOA numbers for every component before submitting.

Get the 2026 Miami permit checklist

One page covering the forms, attachments and inspection sequence Miami contractors get held up on.

No account required. One email, unsubscribe any time.

Filing checklist for Miami

  • Verify whether the property sits inside Miami city limits or in unincorporated Florida — that determines which department accepts the application.
  • Bring current general liability and workers' compensation certificates.
  • Match declared valuation to the signed contract amount.
  • Confirm whether the scope triggers a separate electrical, mechanical or plumbing permit pulled by a licensed sub.
  • Schedule required inspections before covering any work.

Other Florida metros

General guidance for Miami contractors, not legal advice. Confirm requirements and fees with the authority having jurisdiction.