Working in Jacksonville? Save your contractor license, insurance and bond details once, then produce a complete application for the next Jacksonville job — building, mechanical, re-roof or plumbing — in under a minute, plus the OSHA paperwork your crew needs on site.
Who pulls it, what the packet contains, and the inspection sequence — per trade.
Estimate the fee by trade and job value before you sign the work, and see the lines crews forget to quote.
Jacksonville permit cost estimatorThe order of calls by trade, what each inspector checks, and the failure that sends crews back most often.
Jacksonville inspection guideCity of Jacksonville Planning and Development Department, Building Inspection Division
Jurisdiction detail confirmed from the county's own website. Cities inside Duval County may run their own building department.
This city runs its own building department — confirm the property sits inside city limits before filing with the county instead.
Files with
Online portal: JaxEPICS
Consolidated city-county government means this division covers essentially all of Duval County, with online submission for every permit type.
Built by the same engine the app uses — these are the forms and attachments the scope triggers in this jurisdiction, not a generic list.
6 documents on a $12,000 job.
Primary roofing permit application.
Florida Product Approval / Miami-Dade NOA sheet for every roofing component.
Wind mitigation affidavit — required for close-out and used by the owner for insurance credits.
Florida Statute 713.13 — recorded Notice of Commencement required over $2,500.
Jobsite safety plan kept on site for inspection.
Signed scope and price for the homeowner file.
4 documents on a $12,000 job.
Mechanical permit for equipment changeout.
Florida Statute 713.13 — recorded Notice of Commencement required over $2,500.
Jobsite safety plan kept on site for inspection.
Signed scope and price for the homeowner file.
4 documents on a $12,000 job.
Window / exterior door replacement permit application.
Florida Statute 713.13 — recorded Notice of Commencement required over $2,500.
Jobsite safety plan kept on site for inspection.
Signed scope and price for the homeowner file.
One page covering the forms, attachments and inspection sequence Jacksonville contractors get held up on.
No account required. One email, unsubscribe any time.
General guidance for Jacksonville contractors, not legal advice. Confirm requirements and fees with the authority having jurisdiction.
Jacksonville by trade
Other Florida markets
Nearby states